Project Highlight
USACE Ft. Jackson Barracks BLDG 2468 Renovations
CUSTOMER: USACE
Fort Jackson, South Carolina
ADVON’s renovation of Building 2468 at Fort Jackson will modernize the existing enlisted barracks through comprehensive architectural and building system improvements. This Design-Bid-Build project will replace aging infrastructure and upgrade living spaces to support the Army’s permanent barracks requirements.
Construction includes selective demolition and replacement of windows, interior and exterior doors, walls, ceilings, flooring, and finishes. Bathroom improvements include replacing existing tubs with shower stalls, installing new plumbing fixtures, and replacing sanitary, domestic water, and storm drainage piping.
Mechanical improvements include replacement of HVAC equipment, ductwork, vents, fans, and temperature and humidity controls. Electrical work includes upgrades to distribution equipment, replacement of receptacles and switches, and new energy-efficient interior and exterior lighting. The existing fire sprinkler system will also be replaced to meet current fire protection and life safety requirements.
The project incorporates mold remediation and environmental controls during demolition and construction, along with responsible handling and disposal of removed materials. These improvements will provide updated living accommodations and modern building systems to support soldiers stationed at Fort Jackson.




