Project Highlight
Refurbish Potable Water Systems, Wells, and Towers
CLIENT: NASA
NASA Stennis Space Center
Advon Corporation was selected as the design-builder to replace the artesian wells, Wells 4 and 5, with new pumped wells, along with the replacement of Wells 6 and 7 at the Stennis Space Center. The Installation includes the construction of the wells and the installation of appropriately sized turbine pumps. Reconfiguration of water towers 1, 2, 3 and 4 and the installation of 350 feet of potable water and fire system piping is also included within the scope of work.